Day 2

Pfiouuuu...

Starting to have backpain. After a lot of efforts, I managed to pass my phone cable (to pilot electrovalves) and all the stuff, around the pond.

Things are progressing, slower than I planned, but still progressing.
Tomorrow, I will receive the tarpaulin, 100kg, more backpain planned.

I started to remove some earth to reach a 70 cm to avoid freeze and have fishes passing the winter healthy.